The project is a 500MW wind power generation, supporting 150MW/300MWh energy storage PC project. The single energy storage equipment is 3.42MWh liquid-cooled container equipment of Xiangyuan Smart Energy, a total of 88 sets; The delivery was completed on October 30, 2022 and put into operation in November.

